SciELO - Scientific Electronic Library Online

 
 número112Mobilidade urbana e municípios saudáveis na AML: tendências entre as últimas duas décadas (2000 e 2010)Modelação cronológica de sequências sedimentares do estuário da ribeira de Bensafrim com recurso à estatística bayesiana índice de autoresíndice de assuntosPesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Journal

Artigo

Indicadores

Links relacionados

  • Não possue artigos similaresSimilares em SciELO

Compartilhar


Finisterra - Revista Portuguesa de Geografia

versão impressa ISSN 0430-5027

Finisterra  no.112 Lisboa dez. 2019

https://doi.org/10.18055/Finis15157 

ARTIGO ORIGINAL


 

Flood risk management: implementation of the European directive 2007/60/EC in the autonomous region of Madeira

 

Gestão de riscos de inundação: implementação da diretiva europeia 2007/60/CE na região autónoma da Madeira

 

Gestion des risques d'inondation: mise en oeuvre de la directive 2007/60/CE pour la région autonome de Madère

 

Gestión de los riesgos de inundación: aplicación de la directiva europea 2007/60/CE en la región autónoma de Madeira

 

 

Nelson Mileu1, António Carmona Rodrigues3, Adelaide Valente3

1 Investigador Efetivo no Centro de Estudos Geográficos, Instituto de Geografia e Ordenamento do Território, Universidade de Lisboa, Rua Branca Edmée Marques, 1600-276, Lisboa, Portugal. E-mail: nmileu@campus.ul.pt

2 Professor Auxiliar na Faculdade de Ciências e Tecnologia, Universidade Nova de Lisboa, Caparica, Portugal. E-mail: acr@fct.unl.pt

3 Chefe da Divisão de Recursos Hídricos e Qualidade da água da Direção Regional de Ordenamento do Território e Ambiente, Funchal, Portugal. E-mail: adelaidevalente@gov-madeira.pt

 

 

ABSTRACT

The Decree-Law no. 115/2010, of October 22 transposed the Directive 2007/60/EC of the European Parliament and of the Council of 23 October 2007 on the assessment and management of flood risks into Portuguese national law establishing a framework for the assessment and management of flood risks. Flash floods and debris events have a long history in the island of Madeira resulting in several adverse impacts on human health, the environment, cultural heritage and economic activity. For this reason and since the catastrophic debris event of 20 February 2010 the establishment of a flood risk management plan in the Autonomous Region of Madeira (ARM) has assumed double importance. The aim of the paper is to present flood risk analysis methods and technical options adopted in the elaboration of flood hazard and flood risk maps as well the flood risk management plan strategy. The hydrographic basin of Socorridos is used as case study to show the principles and stages of the implementation of the Flood Risk Directive (FRD) in the ARM. In spite of some limitations associated with the volcanic mountain island characteristics and the debris events specificities, the flood risk analysis methods used are in harmony with the requirements of the FRD. Another important issue is the flood risk management plan strategy that addresses all aspects of flood risk management.

Key words: Flood Risk Directive; flood hazard maps; flood risk maps; flood risk management plan; Autonomous Region of Madeira.

 

RESUMO

O Decreto-Lei nº. 115/2010, de 22 de outubro, em que a Diretiva 2007/60/CE do Parlamento Europeu e do Conselho, de 23 de outubro de 2007, relativa à avaliação e gestão dos riscos de inundações é transposta para o direito nacional português, estabelece um quadro de avaliação e gestão dos riscos de inundações. As inundações rápidas e as aluviões têm uma longa história na ilha da Madeira, resultando em vários impactos adversos na saúde humana, ambiente, património cultural e atividade económica. Por este motivo e desde a aluvião catastrófica de 20 de Fevereiro de 2010, o estabelecimento do plano de gestão do risco de inundação na Região Autónoma da Madeira assume uma importância redobrada. O objetivo é apresentar os métodos de análise de risco de inundação e as opções técnicas adotadas na elaboração das cartas de zonas inundáveis e cartas de riscos de inundações, bem como a estratégia do plano de gestão de risco de inundação da Região Autónoma da Madeira. Para demonstrar os princípios e etapas da implementação da Diretiva de Riscos de Inundações na Região Autónoma da Madeira, a bacia hidrográfica dos Socorridos é utilizada como estudo de caso. Apesar das características vulcânicas e montanhosas da ilha da Madeira e das especificidades das aluviões, os métodos de análise de risco de inundação utilizados estão em harmonia com os requisitos da Diretiva de Risco de Inundações. Outra questão importante é a estratégia do plano de gestão dos riscos de inundações que aborda todos os aspetos da gestão dos riscos de inundações.

Palavras-chave: Diretiva Riscos de Inundações; cartas de zonas inundáveis; cartas de riscos de inundações; plano de gestão dos riscos de inundações; Região Autónoma da Madeira.

 

RÉSUMÉ

Le Décret-Loi no. 115/2010, du 22 octobre, où la directive 2007/60/CE du Parlement Européen et du Conseil du 23 octobre 2007 concernant l'évaluation et la gestion des risques d'inondation est transposée dans la législation nationale portugaise, établit un cadre pour l'évaluation et la gestion des risques d'inondation. Les inondations rapides et les débris ont une longue histoire à Madère et ont eu plusieurs conséquences négatives pour la santé humaine, l’environnement, le patrimoine culturel et l’activité économique. Pour cette raison et depuis l'événement catastrophique des débris du 20 février 2010, l'établissement d'un plan de gestion des risques d'inondation dans la région autonome de Madère revêt une double importance. Le but de cet article est de présenter les méthodes d'analyse de risque d'inondation et les options techniques adoptées dans l'élaboration des cartes de zones inondables et de risques d'inondation ainsi que la stratégie du plan de gestion des risques d'inondation. Pour montrer les principes et les étapes de la mise en œuvre de la Directive sur les Risques d'Inondation dans la Région Autonome de Madère, le bassin versant de Socorridos est utilisé comme cas d’étude. Malgré, les limitations liées aux caractéristiques volcaniques et montagneuses de l’île de Madére et aux spécificités des événements de débris, les méthodes d'analyse des risques d'inondation utilisées sont en harmonie avec les exigences de la Directive sur les risques d'inondation. Une autre question importante est la stratégie du plan de gestion des risques d'inondation qui aborde tous les aspects de la gestion des risques d'inondation.

Mots clés: Directive Risques d’Inondation; cartes des zones inondables; cartes des risques d’inondation; plans de gestion des risques d’inondation; Région Autonome de Madère.

 

RESUMEN

El Decreto Ley nº. 115/2010, de 22 de octubre, en el que la Directiva 2007/60/CE del Parlamento Europeo y del Consejo, de 23 de octubre de 2007, relativa a la evaluación y gestión del riesgo de inundación se transpone a la legislación nacional portuguesa, estableciendo un marco de evaluación y gestión del riesgo de inundación. Las inundaciones rápidas y los aluviones tienen una larga historia en la isla de Madeira, lo que resultado en varios impactos adversos en la salud humana, el medio ambiente, el patrimonio cultural y en la actividad económica. Por este motivo y, desde el catastrófico aluvión del 20 de febrero de 2010, el establecimiento de un plan de gestión del riesgo de inundación en la Región Autónoma de Madeira ha adquirido una mayor relevancia. El objetivo de este documento es presentar los métodos de análisis de riesgo de inundación y las opciones técnicas adoptadas en la elaboración de las cartas de zonas inundables y de riesgo de inundación, así como la estrategia del plan de gestión de riesgo de inundación de la Región Autónoma de Madeira. Para demostrar los principios y etapas de la implementación de la Directiva de Riesgo de Inundaciones en la Región Autónoma de Madeira, la cuenca hidrográfica de los Socorridos se utiliza como estudio de caso. A pesar de las características volcánicas y montañosas de la isla de Madeira y las especificidades de los aluviones, los métodos de análisis de riesgo de inundación utilizados en el plan están en línea con los requisitos de la Directiva de riesgo de inundación. Otro tema importante, es la estrategia del plan de gestión del riesgo de inundación que aborda todos los aspectos de la gestión del riesgo de inundación.

Palabras clave: Directiva de Peligro de Inundación; gráficos de zonas de inundación; cuadros de riesgo de inundación; plan de gestión del riesgo de inundaciones; Región Autónoma de Madeira.

 

 

I. INTRODUCTION

The Autonomous Region of Madeira (ARM) is risk-prone to natural hazards of many kinds including landslides, debris, floods, storms and storm surges or forest fires. Flash floods and debris events have a long history in Madeira island (Quintal, 1999) resulting in several adverse impacts on human health, environment, cultural heritage and economic activity. Considering the occurrence in the past of several events, with adverse impacts and the obligation described in the Decree-Law nº 115/2010, of October 22 (transposition of the Directive 2007/60/EC of the European Parliament and of the Council of 23 October 2007 on the assessment and management of flood risks into Portuguese national law), twenty-seven risk areas were identified in the ARM. Bearing in mind the flood hazard maps and flood risk maps for these twenty-seven areas and following the Flood Risk Directive (FRD) principles, the ARM established a flood risk management plan (Resolution no. 805/2017 – JORAM no. 187, I Series, October 27). The European Floods Directive 2007/60/EC, defined the management framework for this flood risk management plan, following the change on the concept of managing flood risk to a more holistic view, by expliciting covering the prevention, mitigation, preparation, response, recovery components of the disaster cycle (Albano, Mancusi, Sole, & Adamowski, 2015). The flood risk management plans vision described in the European Floods Directive 2007/60/EC should address all aspects of flood risk management, considering where possible the maintenance and/or restoration of floodplains, as well as measures to prevent and reduce damage to human health, the environment, cultural heritage and economic activity. Supported by flood hazard maps and flood risk maps, the flood risk management plans must have a summary of the measures and their prioritisation aiming to achieve the appropriate objectives of flood risk management. The management approach for these plans requires that the measures, if considered appropriate, should have a focus on nonstructural initiatives and/or on the reduction of the likelihood of flooding (Mileu, 2018). The structural initiatives can be considered, but the flood risk management plans shall take into account relevant aspects such as costs and benefits. This aspect is particularly important given the limited financial resources for structural initiatives. The relation between flood risk analysis technical issues and the consecutive, development of flood risk management plans in Europe have been studied by different authors (Dráb & Riha, 2010; Mysiak et al., 2013). However for mountainous islands of volcanic origin the references about the implementation of flood risk management plans are scarce.

In this paper, the process of implementing the FRD in ARM is analysed. The methods and technical options adopted in the different stages of flood risk management are described and at the same time the problems and decisions made in the implementation process are discussed. Together with this discussion the flood risk management plan strategy is presented, including the measures for achieving the plan objectives.

The objectives of the paper are to introduce the principles and stages of FRD implementation in the ARM. The preliminary flood risk assessment approach, the flood hazard and risk map elaboration, and also about the development of flood risk management plan are described and discussed. The principles adopted are demonstrated in a case study within the critical area of Socorridos watershed. The paper is structured as follows: the first section is the introduction where the main objective is presented; in the second section the three stages of FRD implementation are presented, followed by section 3 where the case study is the focus. Finally, the conclusions and notes for the next generation plan are presented in section 4.

 

II. IMPLEMENTATION OF FLOOD RISK DIRECTIVE 2007/60/EC

1. Preliminary flood risk assessment

To provide an assessment of potential risks, the FRD requires a preliminary risk assessment. In ARM, the Regional Direction of Spatial Planning and Environment identified the critical areas to be mapped considering the adverse impacts of floods (DROTA, 2015). The criteria used for the selection of critical areas were the following: a flood event with occurrence of at least one victim (dead, missing); a flood event with occurrence of affected persons (evacuated, homeless, injured); a flood event with damage to at least one public/private infrastructure; and hydraulic interventions of watercourses, for protection and mitigation, in particular those following the debris event of 20 February 2010. These criteria led to the selection of 27 critical areas (fig. 1) in the ARM.

 

 

An important issue in the preliminary flood risk assessment was the description of the floods which have occurred in the past and which had significant adverse impacts on human health, the environment, cultural heritage and economic activity (table I). The historical flood records in ARM correspond to different dates; have several sources and contexts of elaboration, showing the importance of the phenomenon, namely the debris events. In this context, the historical description made by Silva (1940) and Quintal (1999) "Debris of Madeira from the 19th Century" deserve particular attention. More recently and after the disaster of February 20, 2010, the "Madeira Island Debris Risk Assessment - Base Report" (SRES, 2010) summarizes the main debris events in the island of Madeira up to the year 2010.

 

 

More recently and after the event of February 20, 2010, there were other relevant events, such as the storm of November 6, 2012 that affected the municipalities of Porto Moniz and S. Vicente and the storm of November 29, 2013 that affected the municipalities of Machico and Santana (table II).

 

 

After the catastrophe of February 20, 2010, several research projects focused on hydrologic and hydraulic aspects were developed. Sepúlveda (2011) calculated two extreme precipitation indices and concluded that the areas of Madeira Island with the highest number of intense precipitation phenomena are located at higher altitudes in the Northwest-Southeast direction. Fragoso et al., (2012) analysed the meteorological component of the 20 February flash-floods in Madeira and verified that the 20 February 2010 event was preceded by an equally outstanding anomalous accumulated precipitation, particularly on the upper parts of Eastern Mountains. Couto, Salgado, and Costa (2012) analysed the intense rainfall events on Madeira Island during the 2009/2010 winter and concluded that the high rainfall amounts observed were directly related to the orographic forcing. Reis (2014) modelled the annual maximum of daily rainfall using a generalized extreme value distribution, checking that the spatial distribution of precipitation in Madeira Island is affected by its topography. Caetano (2014) calculated the flood peak discharge in different sections of 39 watersheds in Madeira and notes that rainfall parameter has a significant effect but is not the only influencing factor.

Focusing on the debris event from February 20, 2010, Castro (2011) characterized the basin of the Ribeira de João Gomes from the point of view hydraulic, hydrologic and sediment transport, achieving estimates of values of liquid flow rates and flow velocities. Barreto (2013) analysed the basin of the Ribeira de Machico from the hydrological and hydraulic point of view, prepared a vulnerability map and a list of possible intervention works and mitigation measures to be implemented. In Santa Cruz municipality, Peixoto (2013) analysed the flash floods, urban floods and costal erosion. The conclusions of the analysis are that the most frequent events are urban floods due to the incapacity of the drainage network.

Using the municipality of Funchal as case study, Góis (2014) analysed the vulnerability to flash floods, noting that the downtown has a high exposure to flash floods. The Ribeira dos Socorridos and Ribeira do Vigário basins were characterized from hydraulic and hydrologic aspects by Marques (2014), where the difficulty in calculating solid transport is highlighted.

In the context of climate change strategy for ARM and its hydrogeological risks analysis, Reis, Bergonse, Simões, and Filipe (2015) point out a potential future decrease in the frequency of intense precipitation events, that may lead to a higher accumulation of deposits in slopes and riverbeds, which may cause floods/debris to become more severe due to the amount of material available, the strangulation effect and future evolution of soil erosion.

2. Flood hazard maps and flood risk maps

The second stage of FRD 2007/60/EC is the preparation of flood hazard maps and flood risk maps. The concept of risk adopted was established in Decree-Law no. 115/2010, of October 22, where "Flood risk" means the combination of the probability of flooding, taking into account its magnitude, and their potential adverse consequences for human health, the environment, cultural heritage, infrastructure and economic activities, being their harmful consequences evaluated by identifying the number and type of activity affected and can sometimes be supported by an analysis quantitative.

The overall risk analysis relates the hazard maps with the vulnerability of the 27 critical areas. The following flow chart (fig. 2) summarizes the analysis that leads to flood risk mapping.

 

 

The first step to obtain flood hazard maps is the calculation of flood intensity and results from the following expression (eq. 1) adopted from Wallingford (2005):

 

 

where HR is (flood) hazard rating, d is the depth of flooding (m) and v is the velocity of floodwaters (m/sec).

The hydrological modelling was made for the return periods of 20, 100 and 500 years as required by the Portuguese legislation. In order to calculate peak flow data, the precipitation values were obtained in two different ways: 1) In the island of Madeira, the hydrological modelling was supported by the precipitations defined in the work of Caetano (2014). This work used precipitation data provided by the Regional Civil Engineering Laboratory (LREC) and Investment and Water Management (IGA), consisting of 44 stations with annual maximum daily rainfall records over 15 years, dating back to the hydrological year 1935 / 1936 and 2) In the island of Porto Santo, the precipitations for the three return periods were obtained from rainfall intensity-duration curve, calculated from the Porto Santo/Aeroporto weather station data. The Porto Santo/Aeroporto daily rainfall data for the series between 1961 and 2016 and hourly rainfall data for the series between 1999 and 2016 were provided by the Portuguese Institute of Sea and Atmosphere. For all the basins, the peak flow data was obtained through the application of the HEC-HMS hydrological precipitation-runoff model.

The HEC-GeoRAS/HEC-RAS hydraulic model was used to map flood extent, flood velocity and flood depth. Considering that in mountain basins flash floods may trigger the mobilization of varying amounts of solid load (Garrote et al., 2018) the integration of the solid material in the Madeira island basins was done by establishing in the cross-sections the deposition volume. A more detailed description of the technical aspects of hydrologic and hydraulic models is outside the scope of this paper, but can be accessed in the report describing the studies for obtaining the flood risk maps the flood risk maps of the ARM (DROTA, 2016).

After obtaining the flood velocity maps and flood depth maps, the flood hazard maps were calculated based on the critical values described in table III.

 

 

The adverse consequences mapping was carried out as a result of the reclassification of land use, and integrating the potentially affected areas, trough identifying and locating the exposed populations and infrastructures. The following types of potential adverse consequences were considered: number of inhabitants potentially affected; cultural heritage; economic activity; and environmental consequences.

The flood risk maps combine the hazard flood mapping and the potential adverse consequences maps. The degree of flood risk is obtained intersecting the flood hazard class and the potential adverse consequences level, following the risk matrix in figure 3.

 

 

In addition to the representation of the risk class deduced from the risk matrix, some mountain streams that cross populated areas were mapped. These watercourses were identified from the list provided by the Regional Direction of Social Equipment and Conservation and are classified into two classes of risk. The high risk class includes areas adjacent to mountain watercourses that have been affected by known historical events of landslides and consequent formation of floods. The medium risk class includes all other areas of flood trajectories that can to be affected by extreme events, whose future human occupation is unfeasible, or which have undergone structural reinforcement and protection interventions.

As required by the FRD 2007/60/EC and Portuguese legislation, on the basis of the flood hazard maps and flood risk maps, a flood risk management plan was established. The general objective of the ARM Flood Risk Management Plan is to reduce the potential harmful consequences of floods to human health, the environment, cultural heritage, infrastructure and economic activities, in areas identified as having significant potential risks. This general objective integrates the following strategic objectives: i) Increasing the perception of flood risk and strategies of action in the population and in the social and economic stakeholders; ii) Improve knowledge and predictive capacity for a better flood risk management; iii) Improve spatial planning and exposure management in flood areas; iv) Improve resilience and reduce the vulnerability of elements located in areas of possible flood; v) Contribute to the improvement or maintenance of good water bodies.

The ARM Flood Risk Management Plan followed the disaster management cycle phases. For this effect, establishes the measures to be implemented according to four types: Recovery and Learning, Prevention, Protection and Preparedness. This plan composed of a set of 46 measures that have as strategic framework the obligation to reduce the risks associated with floods, considering the time period that takes to execute the measure and the time available to carry out it, until 2018, 2019 or 2021. The measures are applied considering the following aspects: a) the type of exposed elements, and the risk to which they are exposed; b) The geographical areas where several relevant exposed elements (e.g. population) are or may be located; c) The basin or part of the river basin, where the Critical Zone is integrated, (aiming to reduce the gravity of the phenomenon). Finally, the effectiveness of the measures must be assessed, which depends, of course, on the return period for which results are to be achieved.

An important issue in the ARM Flood Risk Management Plan development was the strong public participation and stakeholder involvement. Besides the meetings with the main stakeholders, two public presentations were made focused on the presentation of flood risk maps and the flood risk management plan. In parallel, the plan was subject to a period of public consultation resulting in a report containing the answers to all participants.

The preliminary flood risk assessment, the flood hazard maps, the flood risk maps and flood risk management plan were uploaded into the European Environment Agency (EEA) reporting obligations database (available at https://rod.eionet.europa.eu/obligations/603/). For simpler and faster access to flood hazard maps and flood risk maps, geographic information was uploaded into a webgis application (fig. 4).

 

 

III. CASE STUDY

This section demonstrates the procedures described above using the Socorridos critical area as case study.

The watershed of Ribeira dos Socorridos is located in the south coast, flows in a steep valley surrounded by mountains and is one of the most extensive on the island (fig. 5). A business park, several companies and important regional infrastructures, are located in the terminal section.

 

 

Figure 6 shows the topology considered in the hydrological modelling of the Ribeira dos Socorridos watershed. The hydrological model allowed obtaining the flow rates for different return periods in several river cross-sections. At the outlet of Socorridos stream, the maximum flood discharges, are 844.7m3/s (Q20), 1067.2m3/s (Q100) and 1326.3m3/s (Q500) (fig. 6).

 

 

In the geometric hydraulic model, the sections were located taking into account transitions along the watercourse, changes in direction, contractions, expansions and steep slopes, resulting for the Ribeira dos Socorridos watershed in a hydraulic model with 795 river cross-sections cutlines (fig. 7).

 

 

Part of the ARM Flood Risk Management Plan was the proposal of flood protection measures in the watershed of Ribeira dos Socorridos based on hazard and risk maps (figs. 8 and 9) obtained from the hydraulic modelling.

 

 

 

 

Although the population potentially affected in the different scenarios is small, in terms of exposed elements there is a high economic vulnerability due to the number and type of potentially affected companies (table IV).

 

 

In this critical area, two important facilities are established and were identified in the plan. The Thermal Power Station of Vitória and the Autonomous Unit of Natural Gas are two companies in the energy field that operate in the critical area of the Socorridos and develop their activity for the whole island. The Thermal Power Station of Vitória aims the production of electric energy, from petroleum fuels. This industry is covered by the Directive 2012/18/EU and the Decree-Law no. 127/2013 on the control of major-accident hazards involving dangerous substances. The Autonomous Unit of Natural Gas is covered by the Directive 2010/75/EU on integrated pollution prevention and control.

The ARM Flood Risk Management Plan measures are organized in generic and specific measures. For the critical area of the Ribeira dos Socorridos, 27 generic measures were established. The generic measures include studies, legislation, topographic surveys or dissemination and awareness actions. The specific measures are dedicated to the critical zone, and in Socorridos the following can be highlighted: reinforcement of longitudinal structures (walls), compatibilization with the Internal Emergency Plan and strengthening the Thermal Power Station of Vitória self-alert system.

 

IV. DISCUSSION AND CONCLUSIONS

In this paper the strategy regarding the implementation of the Directive 2007/60/EC of the European Parliament and of the Council on the assessment and management of flood risks is discussed within the context of ARM. The research shows that ARM Flood Risk Management Plan is focused on prevention, protection, preparedness and recovery measures, addressing all aspects of flood risk management. One of the central aspects of the plan is the implementation of measures to increase the knowledge of the debris hazard in the context of Madeira island. Further research in mountain basins flash floods and debris hazard need to be carried out to improve the models and outputs. Although some structural measures were still defined, the focus of the measures was the implementation of non-structural initiatives on the reduction of the likelihood of flooding like spatial data collection, providing flood information to citizens, debris forecasts and early warning systems or the development of emergency plans. The promotion of sustainable land use practices and spatial planning restrictions to be included in municipal master plans are also other important measures that will prevent urban development in risk-prone areas.

The methodology adopted in hydrological modelling was conditioned by the availability of hydrometric data as well as the existence of previous studies. In hydraulic modelling, although several altimetric data sources were available, it was decided to use altimetric data from the 2007 aerophotogrammetric survey at 1:5000 scale, notwithstanding the limitations associated with the scale and temporal outdating. These limitations associated with hydrometric data availability, altimetric accuracy and temporal outdated data were considered in the development of the plan through data acquisition and studies development actions.

It is expected that in the next revision/update of the ARM Flood Risk Management Plan these difficulties will be overcome, allowing an evolution of the plan that takes into account the likely impacts of climate change on the occurrence of floods.

 

ACKNOWLEDGEMENTS

The paper contains results from the ARM flood risk management plan, elaborated by the Regional Direction of Spatial Planning and Environment/Regional Secretary for the Environment and Natural Resources and published in the Resolution no. 805/2017 – JORAM no. 187, I Series, October 27.

 

REFERENCES

Albano, R., Mancusi, L., Sole, A., & Adamowski, J. (2015). Collaborative Strategies for Sustainable EU Flood Risk Management: FOSS and Geospatial Tools - Challenges and Opportunities for Operative Risk Analysis. International Journal of Geo-Information, 4, 2704-2727. Doi: https://doi.org/10.3390/ijgi4042704        [ Links ]

Barreto, V. (2013). Estudo da Bacia Hidrográfica da Ribeira de Machico - Vulnerabilidade de Cheias [Ribeira de Machico Watershed Study - Flood Vulnerability]. (MsC thesis in Civil Engineering). Universidade da Madeira, Funchal.         [ Links ]

Caetano, C. (2014). Avaliação do risco de aluviões das ribeiras da ilha da Madeira [Assessment of debris on Madeira Island]. (MsC thesis in Environmental Engineering). Instituto Superior Técnico, Lisboa.         [ Links ]

Castro, J. (2011). Caracterização hidráulica, hidrológica e de transporte sólido do evento de 20 de Fevereiro de 2010 na Ribeira de João Gomes Ilha da Madeira [Hydraulic, hydrological and solid transport characterization of the event of February 20, 2010 in Ribeira de João Gomes Madeira Island]. (MsC thesis in Civil Engineering). Universidade da Madeira, Funchal.         [ Links ]

Couto, F., Salgado, R., & Costa, M. (2012). Analysis of intense rainfall events on Madeira Island during the 2009/2010 winter. Nat. Hazards Earth Syst. Sci., 12, 2225–2240. Doi: https://doi.org/10.5194/nhess-12-715-2012

Direção Regional de Ordenamento do Território. (DROTA). (2016). Autonomous Region of Madeira flood hazard and flood risk maps technical report. Funchal: Municípia and Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa, Secretaria Regional do Ambiente e dos Recursos Naturais.         [ Links ]

Direção Regional de Ordenamento do Território. (DROTA). (2015). Implementation of Directive 2007/60 / EC, of October 23, transposed by Decree-Law 115/2010, of October 22 (Directive on the Assessment and Management of Flood Risks). Retrieved from http://cdr.eionet.europa.eu/pt/eu/floods/envu4yc7q/AvaliacaoGestaoRiscoInundacoesMadeira.pdf        [ Links ]

Dráb, A., & Riha, J. (2010). An approach to the implementation of European Directive 2007/60/EC on flood risk management in the Czech Republic. Nat. Hazards Earth Syst. Sci., 10, 1977-1987. Doi: https://doi.org/10.5194/nhess-10-1977-2010        [ Links ]

European Parliament and the Council of the European Union. Directive 2007/60/EC on the assessment and management of flood risks. Official Journal of the European Union, L 288/27, Brussels, Belgium.         [ Links ]

Fragoso, M., Trigo, R., Pinto, J., Lopes, S., Lopes, A… Magro, C. (2012). The 20 February 2010 Madeira flash-floods: synoptic analysis and extreme rainfall assessment. Nat. Hazards Earth Syst. Sci., 12, 715–730. Doi: https://doi.org/10.5194/nhess-12-2225-2012

Garrote, J., Díez-Herrero, A., Bodoque, J., Perucha, M., Mayer, P., & Génova, M. (2018). Flood Hazard Management in Public Mountain Recreation Areas vs. Ungauged Fluvial Basins. Case Study of the Caldera de Taburiente National Park, Canary Islands (Spain). Geosciences, 8, 6. Doi: https://doi.org/10.3390/geosciences8010006        [ Links ]

Góis, L. (2014). As inundações no Funchal: contributos para o Ordenamento do Território [The floods in Funchal: contributions to Spatial Planning]. (MsC thesis in Geography and Regional planning). Faculdade de Ciências Sociais e Humanas, Universidade Nova de Lisboa, Lisboa.

Marques, M. (2014). Caracterização hidráulica, hidrológica e do transporte sólido das principais linhas de água (ribeiras) do concelho de Câmara de Lobos - ilha da Madeira [Hydraulic, hydrological and solid transport characterization of the main water lines (streams) of the municipality of Câmara de Lobos - Madeira Island]. (MsC thesis in Civil Engineering – Specialization in Hydraulics). Instituto Superior de Engenharia de Lisboa, Lisboa.

Mileu, N. (2018). Integrating risk maps in the definition of municipal territorial models. Finisterra – Revista Portuguesa de Geografia, LIII(107), 51-66. Doi: https://doi.org/10.18055/Finis12206

Mysiak, J., Testella, F., Bonaiuto, M., Carrus, G., De Dominicis, S., Cancellieri… Grifoni, P. (2013). Flood risk management in Italy: challenges and opportunities for the implementation of the EU Floods Directive (2007/60/EC). Nat. Hazards Earth Syst. Sci., 13, 2883–2890. Doi: https://doi.org/10.5194/nhess-13-2883-2013

Peixoto, A. (2013). Inundações urbanas, cheias rápidas e galgamentos costeiros na cidade de Santa Cruz, Ilha da Madeira: áreas afetadas, frequência e avaliação da vulnerabilidade funcional [Urban floods, floods and coastal flooding in the city of Santa Cruz, Madeira: affected areas, frequency and evaluation of functional vulnerability]. (MsC thesis in Risks, Cities and Spatial Planning). Universidade do Porto, Faculdade de Letras, Porto.

Quintal, R. (1999). Aluviões da Madeira. Século XIX e XX [Debris in Madeira. XIX and XX centuries]. Territorium 6, 31-48.         [ Links ]

[Hydrogeomorphological Risks - Impacts, vulnerabilities and adaptation to climate change]. Relatório Setorial da Estratégia CLIMA-Madeira. Estratégia de Adaptação às Alterações Climáticas da Região Autónoma da Madeira, Funchal: Secretaria Regional do Ambiente e Recursos Naturais. Retrieved from https://observatorioclima.madeira.gov.pt/wp-content/uploads/pdfs/rel_hidrogeo.pdf

Reis, D. (2014). Statistical Modelling of Extreme Rainfall in Madeira Island. (PhD thesis in Mathematics). Universidade da Madeira, Funchal.         [ Links ]

Sepúlveda, S. (2011). Avaliação da precipitação extrema da Ilha da Madeira [Evaluation of the extreme precipitation of Madeira Island]. (MsC Thesis in Environmental Engineering). Instituto Superior Técnico, Lisboa.         [ Links ]

Silva, F. (Pe). (1940). Elucidário madeirense [Explanatory book of little-known things from Madeira]. Funchal: Secretaria Regional da Educação e Cultura (SREC).         [ Links ]

Secretaria Regional do Equipamento Social. (SRES). (2010). Estudo de Avaliação do Risco de Aluviões da Ilha da Madeira Relatório Base [Madeira Island Debris Risk Assessment Study]. Funchal: Secretaria Regional do Equipamento Social da Região Autónoma da Madeira.         [ Links ]

Wallingford, H. (2005). Flood Risks to People Phase 2, The Flood Risk to People Methodology. Environment Agency\Defra R&D Technical Report FD2321/TR1, March 2005.         [ Links ]

LEGAL SOURCES

Decreto-Lei no. 115/2010 of October 22. Diário da República, 1.ª série — N.º 206.

Decreto-Lei no. 127/2013 of August 30. Diário da República, 1.ª série — N.º 167.

Resolução nº 805/2017, October 27. Jornal Oficial da Região Autónoma da Madeira, no. 187, 1.ª Série.

 

Recebido: outubro 2018. Aceite: setembro 2019.